Posts

Showing posts from August, 2024

sequential (109) Rugby Design (Segment and Rugby)

Image
https://kamchihau.blogspot.com/2024/07/sequential-109.html . Ref:  https://kamchihau.blogspot.com/2024/07/sequential-109.html?m=1 . . John : See the 1st picture.  There're 2 registers in the  circuit.  They are R0 and R1. Me: Ok. John:  The modulator send a control's signal to both R0 and R1. The end of the Load shift line of R0 doesn't link to the beginning of the Load shift line of R1. . Me: In the case of "Load shift line", "Output availability line", a Rugby Design is more suitable cause those line is Boolean relationship.  . John: Boolean relationship means it's either true or false. It's either 0 or 1. . "Load shift line [either 0 or 1]",  "Output availability line [either 0 or 1]" . Me: Ok. . John: See the 3rd picture.  In a workable circuit,  there must be at least 4 clock lines.  They are the Clock lines of RJ45,  Satellite's Antenna, System and internal for-loop.  . Me: Ok. . John : I give you an example of inter...